Plan a homebrew corner — sink to shelf to tap
A homebrew corner isn't a room you furnish — it's a workflow you lay out. Brew day starts and ends at a deep utility sink, everything between lives on one tall shelf, and the finished batch waits at the kegerator. In a 9×9 bay the three run the walls in order — sink, shelf, tap — and the middle of the floor stays empty on purpose, because that's where the kettle, the burner, and you actually work.
Brewing has an order to it that most hobbies don't: clean, mash, boil, ferment, keg, clean again. A brewing corner works when the floor plan follows that order — the sink where every brew day opens and closes, the shelf that holds each stage's gear, and the kegerator where the batch finally lands. Four pieces, one loop around the walls.
The trick in 9×9 is what you don't place. Every item here hugs a wall in about two feet of depth, which leaves an open square of floor more than five feet across in the middle. That's not leftover space — brew day is the floor: the kettle, the burner, the chiller, and a lot of hose all live there for an afternoon. Search the exact names in the Furnish panel and lay the loop out before you carry a single carboy downstairs.
What you'll need
- •Utility Sink (24″ × 22″, 34″ tall) — brew day starts and ends here
- •5-Tier Shelf 48″ (48″ × 24″, 72″ tall) — fermenters up top, grain and kettles below
- •Kegerator (24″ × 26″, 34″ tall) — where the finished batch lives on tap
- •Storage Tote × 2 (24″ × 18″ each) — bottles, caps, and cleaning gear
- •A 9 × 9 ft corner — a garage bay or basement, ideally with water within reach
Step by step
- 1
The sink goes in first
Search Utility Sink and set it in the top-left corner, back against the top wall. It's a small footprint — 24 inches wide, 22 deep — but it's the most-used square of the whole plan: every brew day starts with sanitizing here and ends with washing here. Keep 24 inches clear in front of the basin; you'll be standing in that spot with a bucket more than anywhere else in the room.
- 2
Run the shelf down the right wall
Search 5-Tier Shelf 48″ and place it against the right wall, long side along the wall so its 48-inch run reads vertically on the plan and it stands just 24 inches into the room. Start it about 30 inches down from the top wall — that saves the top-right corner for the tap. Six feet of shelving sorts the hobby by height: fermenters up top, grain and kettles below, so the stages you grab most often sit at arm level.
The loop on the plan — sink, shelf, and tap around the walls, and the brew-day floor left open. - 3
The kegerator takes the top-right corner
Search Kegerator and back it into the top-right corner, taps facing the room. It's 24 inches wide and 26 deep — the same wall-hugging depth as everything else — and it's the finish line of the workflow: sink to shelf to tap, one unbroken run along the walls. Leave the floor in front of it open enough to wheel a full keg in; a five-gallon keg is not a thing you lift over furniture.
- 4
Totes on the left wall
Search Storage Tote and place two of them along the left wall below the sink, long sides against the wall. Each is 24 by 18 inches and only 16 inches tall — one for bottles and caps, one for cleaning gear, both an arm's reach from the basin where that gear gets used. Together with the shelf across the room they frame the open middle: about five and a half feet of clear floor from tote to shelf.
- 5
Prove the loop in 3D
Switch to 3D and stand in the middle of the room. This is where the plan earns it: the six-foot shelf against the right wall, the sink and the taps each holding a corner, and an empty square of floor in the center big enough for a kettle, a burner, and you. Walk the loop once — sanitize at the sink, pull grain from the shelf, imagine the kettle in the middle, pour at the tap. If any leg of that walk crosses furniture, slide the piece, not the workflow.
The corner in 3D — every piece on a wall, the middle left for brew day.
Tips
Plan for water on the floor, not just in the sink
Brew day moves five-plus gallons around an open floor, and some of it always escapes. If the corner has a floor drain, center the open workspace on it; if not, plan a waterproof mat for the middle square and keep the Storage Tote with towels and cleaning gear nearest the action.
Make the sink a sanitation station
The Utility Sink corner is where clean happens, so let everything dirty flow one way — toward it. Sanitizer, brushes, and spray bottles live in the tote beside the basin, and the 24 inches of clear floor in front is the one clearance on this plan you never lend to anything else.
Pick the temperature-stable corner
Fermentation wants a steady 65–72°F, and a garage door or a water heater can swing a corner 20 degrees in a day. Give this layout the interior-most, most stable corner you have — the kegerator handles the cold side of the hobby on its own, but nothing on the shelf can fix a room that bakes every afternoon.
Common mistakes
Filling the middle of the floor
The open square in the center is the whole point of this plan — kettle, burner, chiller, and hose all land there on brew day. Gear that starts living on the floor between brews slowly eats the workspace; if it's not in use, it goes on the shelf or in a tote.
Letting storage creep into the sink clearance
The 24 inches in front of the basin is where every carboy, keg, and kettle gets washed. Totes and buckets drift toward the sink because that's where they're used — park them along the left wall below it, never in front of it.
Storing full fermenters overhead
The top tiers of a 72-inch shelf are for empty carboys and light gear. A full fermenter weighs fifty-plus pounds — ferment it low and cool, and never plan a layout that asks you to lift liquid above shoulder height.
Frequently asked questions
How much space does a homebrew setup need?
A 9×9 foot corner covers it. Every piece in this layout — the utility sink, the 5-tier shelf, the kegerator, and two storage totes — stands within about two feet of a wall, which leaves an open working square more than five feet across in the middle. That open floor is the real requirement: brew day needs room for a kettle, a burner, and a person, not more furniture.
Where should the kegerator go in a brewing corner?
At the end of the workflow, not the middle of it. In this plan it backs into the top-right corner with the taps facing the room — the last stop on the sink-to-shelf-to-tap line — with open floor in front so a full five-gallon keg can be wheeled straight in. Keep it out of the sink's washing clearance and away from anything that blocks its door.
Can I set up a brewing corner in my garage?
A garage bay or basement corner is the classic home for one — the floor can get wet, the shelf can be tall, and nobody minds the hose. The deciding factor is temperature: fermentation wants a steady 65 to 72 degrees, so choose the corner farthest from the garage door and any heat source, and check that the spot keeps its footing year-round before you commit the layout.
Start designing your room
Draw it, furnish it, walk through it in 3D — on web, iOS, and Android.
Open RoomSketch3DOne-time purchase · No subscription · Web, iOS & Android